© CleanPower AS, Dvergsnessvingen 160, N-4639 Kristiansand S, Norway   |   post (at) cleanpower.no   |   T: +47 71 56 66 00

 Projects: Raviège eco-flow plant

The Turbinator installed at the Raviège dam exploits the eco-flow release from the Raviège dam to the Agout river, located in the Tarn region in South-West France.

Since the eco-flow release was increased in 2014, EDF sought a compact turbine solution that would fit the narrow space available between the existing bottom outlet and other existing civil works. Following technical evaluations and site visits to existing installations in Norway, EDF selected the Turbinator.

The CleanPower Eco-flow solution secures correct water release to the river, while producing annually around 2 GWh, corresponding to the annual consumption consumption of a village with 1000 inhabitants.

The project received support from Innovation Norway.

  • LinkedIn Social Icon
  • Twitter Social Icon