Hegset dam mini hydropower plant

 

 

Photo showing first water through the turbine,
before the downstream reservoir had reached its
normal level to submerge the draft tube outlet.

CleanPower AS in 2010 made a pilot installation based on the very first Turbinator-model.

The project demonstrates how suitable the  Turbinator is for producing electricity from a reserved / environmental flow outlet - in this case the mandatory outlet from the Hegset dam, located in the Nea riverbed south east of Trondheim, Norway. The outlet shall secure a flow of 1.5 m3 per second at a measurement point a few kilometers downstream. The outlet operates five months per year, May through September.

Customer and partner in the project has been the dam owner Statkraft Energi AS.

As this is a pilot project being the first full scale demonstration of the technologies developed by CleanPower AS, the project was financed as an IFU-contract part financed by Innovasjon Norge. A central element of such a contract is that the supplyer company (CleanPower) and the customer company (Statkraft) cooperates on a project with a significant R&D content, and that the project is a necessary step towards commercialisation of the developed technologies.

Under this contract model the project costs have been shared between the three parties: CleanPower, Statkraft and Innovasjon Norge.

The design parameters of the installation are:

  • Head   24 m
  • Water flow   1.2 m3/s
  • Installed power   280 kW